Home / Renovation loan calculator
Renovation loan calculator
Two ways to borrow for the same renovation, as arithmetic: all of it on day one, or in stages as the work is done.
| Figure | Top-up or redraw | Construction loan |
|---|---|---|
| Interest on the renovation money during the works | $3,000 | $1,500 |
| Fees you entered | $0 | $0 |
| Cost over the works | $3,000 | $1,500 |
| Whole home loan repayment afterwards, per month | $3,222 | $3,222 |
| More than you pay now, per month | $644 | $644 |
On these figures, drawing the renovation in stages costs $1,500 less over the works.
Only the renovation money is compared during the works: the loan you already have costs the same either way. A top-up or a redraw adds the whole renovation to the balance on day one at your home loan’s rate. The construction loan is drawn in equal progress payments spread evenly over the works, the last at completion, interest only until then; afterwards it is treated as a separate split at its own rate over the years left on your loan. Principal and interest throughout, no rate changes, and only the fees you type in.
What the two columns are
A top-up increases your home loan by the cost of the renovation, usually after a new valuation. A redraw takes back money you have already paid ahead. They are different products and the same arithmetic: either way the whole renovation is on your balance from the first day and charging interest at your home loan’s rate, whether the builder has started or not. An offset account you draw down works the same way, too.
A construction loan pays the builder in stages against a building contract, like a new build. Interest is charged only on what has been paid out so far. In exchange, it usually comes with a progress payment schedule, an inspection or valuation before each payment, and its own fees.
Which way the answer goes
With nothing else different, stages always win on interest during the works, because less money is borrowed for less time. On the example above, $100,000 over 6 months at 6%, the gap is $1,500. That is the whole advantage, and it is small next to the renovation.
So the answer is decided by what you type into the other fields. Add $2,000 of construction loan fees to the same example and the construction loan costs $3,500 over the works, $500 more than the top-up. A higher rate on the construction loan also follows you for the whole term afterwards, and the last row shows what that does to every repayment.
When a lender may not offer you the choice
Lenders set their own rules for when a renovation needs a construction loan rather than a top-up: typically structural work, a builder’s fixed-price contract above some amount, or a valuation that depends on the work being finished. Those limits are each lender’s and are not published in one place, so this calculator does not guess at them. It shows the arithmetic either way.
Questions for a broker or lender
- For this renovation, can I top up or redraw, or will you require a construction loan?
- What does the construction loan charge: establishment, per progress payment, per inspection?
- Is the construction rate the same as my home loan rate, and what happens to it after completion?
- Will the top-up need a new valuation, and does it take the finished renovation into account?
Building new rather than renovating? The progress payment calculator takes a full stage schedule.