Home / Construction loans explained
Construction loans, explained
A loan for a house that does not exist yet. That one fact explains almost everything that is different about it.
Why it is paid out in stages
An ordinary home loan pays for a house that exists, on the day you buy it. A construction loan pays for one that does not exist yet, so the lender does not hand over the whole amount at the start. It pays your builder in instalments, called progress payments or draws, as each stage of the work is finished: usually a deposit, then base (the slab or footings), frame, lock-up, fixing and completion.
The stages and the share of the contract price due at each are written into your building contract. In Victoria the law caps what can be claimed at each stage; in Queensland and New South Wales the payments have to follow the work actually done. Progress payment stages, state by state has the detail and the sources.
You pay interest on what has been drawn
Interest is charged on the amount paid out so far, not on the whole loan. During the build most construction loans are interest only, so each month you pay interest on a balance that grows at every stage. That is why the interest “climbs stage by stage”: on $480,000 at 6.6%, interest-only on the whole amount would be $2,640 a month, but early in the build you are paying it on a small fraction of that.
Over a 9-month build with the stages evenly spaced, that comes to $9,742 on Victoria’s stage limits. The same loan drawn in full on day one would cost $23,760 over the same months. The calculator on the home page does this on your figures, and the full one lets you set each stage’s share and month.
What happens before each draw
Before releasing a progress payment, the lender generally wants evidence that the stage has actually been reached: the builder’s invoice for the stage, and often an inspection or a valuer’s report. Some lenders charge a fee for each one. The money then goes to the builder, not to you.
Lenders also usually expect your own contribution to be spent first: the deposit and any savings you are putting in go to the builder before the lender’s money does. That pushes the loan’s first draw later and lowers the interest during the build. On the example above, $100,000 of your own money paid in first brings the interest from $9,742 to $5,821.
What the lender looks at first
A construction loan is assessed against a building contract, so the lender usually wants the contract itself, the plans and specifications, and a valuation of what the finished house will be worth (often called an “as if complete” valuation). Before the first draw lists the usual paperwork and the questions worth asking.
Most lenders prefer a fixed-price contract, where the builder’s price is set up front. A cost-plus contract, where you pay the builder’s costs plus a margin, leaves the final figure open, and a lender lending against that figure has less to go on. Ask before you sign which kinds a lender will accept.
What happens when it is finished
At completion the builder claims the final payment, the lender releases it, and the construction period ends. The loan then usually switches to ordinary principal-and-interest repayments over the rest of its term, on whatever rate applies then. On the home page’s example, $480,000 borrowed over 30 years at 6.6% is $3,066 a month.
Most construction loans set a limit on how long the construction period can run. If the build overruns it, what happens is in the loan’s terms. It is one of the questions to ask before you sign.
What it does not pay for
The loan is drawn against the contract. Anything that is not in the contract — a driveway, fencing, landscaping, window coverings, the upgrades you add halfway through — is generally not covered by it. What a construction loan does not cover goes through the usual list.
Renovating, or knocking down
A large renovation can be paid for the same way, in stages against a builder’s contract, or by adding the cost to your existing loan. The renovation calculator puts the two side by side. A knockdown rebuild is a construction loan with your existing home loan and rent running at the same time; the knockdown rebuild page adds them up.
Questions for a broker or lender
- Is it interest only during the build, and is the interest paid monthly or added to the loan?
- What fees apply: establishment, each progress payment, each inspection or valuation?
- Must my contribution be spent before your first draw?
- Do you accept fixed-price contracts only, or cost-plus as well?
- How long is the construction period, and what happens if the build runs over it?
- What happens if the valuation comes in under the contract price?
None of this is advice about what you should do. It is how these loans usually work and the arithmetic of them; the terms of any particular loan are the lender’s.