Skip to content
Buildloansums

Home / Guides

Guides

The parts of a build loan that the brochure skips. Each one ends with the sums or the questions, not a pitch.

Featured · Contracts 65% the most a Victorian builder can have by lock-up
Progress payment stages, state by state What your builder may claim and when: the Victorian caps that are law, the Queensland template, the NSW rule that payments follow the work, and the deposit limit in each. 6 min read
The loan Before the first draw: what the lender asks for 5 min read Costs What a construction loan does not cover 5 min read The loan Construction loans, explained 7 min read
The loan When the valuation comes in under the contract Not written yet
Contracts Cost-plus contracts and your loan Not written yet
The loan Owner-builder construction loans Not written yet
Costs Building on land you are still paying off Not written yet
Renovations Granny flats and second dwellings Not written yet
Skip the reading. Do the sums. The progress payment calculator

The greyed cards are the backlog, in the order they are worth writing. They are not links, because there is nothing behind them yet.