Home / Guides
Guides
The parts of a build loan that the brochure skips. Each one ends with the sums or the questions, not a pitch.
Featured · Contracts
65%
the most a Victorian builder can have by lock-up
Progress payment stages, state by state
What your builder may claim and when: the Victorian caps that are law, the Queensland template, the NSW rule that payments follow the work, and the deposit limit in each.
6 min read
The loan
Before the first draw: what the lender asks for
5 min read
Costs
What a construction loan does not cover
5 min read
The loan
Construction loans, explained
7 min read
The loan
When the valuation comes in under the contract
Not written yet
Contracts
Cost-plus contracts and your loan
Not written yet
The loan
Owner-builder construction loans
Not written yet
Costs
Building on land you are still paying off
Not written yet
Renovations
Granny flats and second dwellings
Not written yet
Skip the reading. Do the sums.
The progress payment calculator
The greyed cards are the backlog, in the order they are worth writing. They are not links, because there is nothing behind them yet.