Before the first draw
What usually has to be on the lender’s desk before a dollar goes to your builder.
A construction loan is approved against a house on paper. So before the first progress payment, the lender usually wants to see the paper. What follows is the usual list, not any one lender’s; each lender sets its own, and a broker who does construction loans will know the differences.
The contract and the drawings
- The signed building contract, with its price and its progress payment schedule. Most lenders prefer a fixed-price contract.
- The plans and specifications the contract refers to, so the valuer can value what will actually be built.
- A list of anything outside the contract that you are paying for yourself, if the lender asks, because it changes what the finished house is worth and what you need in cash.
The approvals
- Building approval or a building permit for the work, from a council or a private certifier or surveyor, depending on the state.
- The builder’s licence and their home warranty or domestic building insurance, which each state requires for residential work above a threshold it sets. In Victoria, for example, the builder has to give you the policy before taking a deposit on work above the threshold.
The valuation
The lender usually orders a valuation of the land plus the house as it will be once it is finished, often called “as if complete”. The loan is sized against that figure. If it comes in under the contract price plus the land, the gap is generally yours to fund, and that is worth knowing before you sign the contract rather than after.
Your contribution
Lenders generally want your own money — the deposit you pay the builder and any savings you are putting in — spent before their first draw. Keep the receipts. It also means the loan’s interest starts later than the build does, which the progress payment calculator shows: put your own money in the “spent first” field.
At every stage after that
Each progress payment is a new request. The builder issues an invoice for the stage; the lender usually checks the stage has been reached, sometimes with an inspection; and then pays the builder directly. Ask what each draw costs and how long it takes to be paid, because a builder waiting on a slow draw is a builder whose next stage starts later.
Questions for a broker or lender
- What do you need before the first progress payment, and in what form?
- Is the valuation “as if complete”, and what happens if it is under the contract price?
- Is there a fee or an inspection for each progress payment?
- How many business days from a builder’s invoice to payment?
- What happens if I sign a variation to the contract during the build?