Progress payment calculator
Your contract’s stages, the month each one is paid, and your own money going in first. The interest during the build follows from those three things, and nothing else.
The most a builder may claim at each stage under a major domestic building contract to build all stages, as a share of the contract price. A maximum, not a requirement: a contract may claim less at a stage, and can only vary the schedule in the way the regulations allow. Source: Consumer Affairs Victoria, “Deposits and payments for domestic building” (page updated 9 July 2025), checked 2026-11-11.
| Stage | Share | Paid in month | Paid to builder | Drawn so far | Interest to next stage |
|---|---|---|---|---|---|
| Deposit | $24,000 | $238 | |||
| Base | $48,000 | $713 | |||
| Frame | $72,000 | $1,426 | |||
| Lock-up | $168,000 | $3,089 | |||
| Fixing | $120,000 | $4,277 | |||
| Completion | $48,000 | $0 |
- Loan at completion
- $480,000
- Then, per month
- $3,066
- Land loan interest, same months
- $0
- If drawn all on day one
- $23,760
Interest only during the build, charged monthly on what has been drawn, at one rate throughout. Each stage is drawn in the month you give it and carries interest until the next; the last stage is completion, when the loan becomes principal and interest over the term you set. Your own money pays the earliest stages first. The land loan is assumed to be interest-only at the same rate for the length of the build. Fees, valuation charges and rate changes are not included.
How to read your contract into this
Your build contract will have a progress payment schedule: a list of stages and the share of the price due at each. Type those shares into the table. Then ask your builder for an estimated date for each stage and turn them into months from the deposit. That is the whole input; everything else is arithmetic.
If the shares do not add up to 100%, the calculator says so and draws only what you entered. It does not quietly fix them, because a schedule that does not add up is worth a question to your builder.
Why the dates matter more than they look
Interest is charged on each draw from the day it is paid until the build is finished. The biggest draws are usually lock-up and fixing, late in the build, so a delay before them costs little and a delay after them costs a lot: the loan is nearly fully drawn and still charging interest only. Move the completion month out by two and watch the total.
On the home page’s example, $480,000 at 6.6% over 9 months, the stages cost $9,742 in interest. Drawn in full on day one, the same loan would cost $23,760. Put $100,000 of your own money in first and it falls to $5,821.
The two schedules built in
Victoria is the only one of the three largest states that sets the stages in law. Under a contract to build all stages a builder may claim no more than 5% deposit, 10% at base, 15% at frame, 35% at lock-up and 25% at fixing, leaving 10% for completion. The calculator uses those maximums as its default because they are the one split we can stand behind. Source: Consumer Affairs Victoria, “Deposits and payments for domestic building” (page updated 9 July 2025). Checked 11 November 2026.
Queensland has no statutory percentages, but the building regulator’s own template contract prints a split: 5% deposit, 15% at base, 20% at frame, 25% at enclosed and 20% at fixing, leaving 15% for practical completion. It warns builders that claims must stay proportionate to the work done. Source: Queensland Building and Construction Commission, New Home Construction Contract template (July 2023). Checked 11 November 2026.
New South Wales sets no percentages at all: progress payments have to follow the work. Use Custom and your contract’s figures. More in progress payment stages, state by state.
Questions for a broker or lender
- Is interest charged on each draw from the day it is paid, and is it interest-only until completion?
- Is build-period interest paid monthly, or added to the loan?
- Is there a fee per progress payment, or for each inspection before a draw?
- Does my contribution have to be spent before your first draw, and does that include the deposit?
- How long can the build run before the construction period ends, and what happens if it overruns?